Bad Essen |
- |
Freiberuflich |
07/1991 - 01/2016 Dauer 295 Monate |
Rolle Projectmanager |
||
Branche |
Einsatzort siehe CV .................... |
||
Aufgaben Site Supervision Claim Management Projectmanager FIDIC Contracts EPC/Turnkey and "Red Book" Contracts Educational Background 08/80 - 08/82 Technical Secondary School for Building in Dortmund Higher Education Entrance Qualification 10/82 - 12/83 Military Service 09/84 - 07/91 Technical University of Applied Sciences in Bochum, Dept. Hagen Highway Engineering and Transportation M.Sc. (Diplom-Ingenieur) Fields of Specialization Project Implementation Contracting / Tendering Administration of Civil Work Reporting / Documentation FIDIC / VOB Specialist ARRIBA MS Project MS-Office Language Proficiency: German Native Language English Fluent Russian Fair Arabic and Dari Slight Membership in Professional Associations: Verein Deutscher Ingenieure, VDI 1991 to ongoing FIDIC, Switzerland 2001 to ongoing Employment History Start/End Date from January 2013 Employer Freelancer Type of Business International Consultant Start/End Date 01-July-2012 to 15-January 2013 Employer Ingenieurplanung Wallenhorst (IPW) Type of Business Consulting Engineer Country Germany Address 49134 Wallenhorst, Marie-Curie-Straße 4 Position Site Supervisor, Contract Administrator Water Supplies, Sewage and Road Construction Start/End Date 01-March-2010 to March 2011 Employer Asian Development Bank (ADB) Type of Business International Development Bank Country Philippines Address 6 ADB Avenue, Mandaluyong City 1550 Position ADB Representative North Afghanistan Project Implementation Consult in Mazar-e-Sharif Start/End Date 01-Sep-2006 to 28-Feb-2010 Employer Kocks Consult GmbH Consulting Engineers Type of Business Consulting Engineers Country Germany Address Stegemannstraße 32-38 Koblenz, Germany, Rheinland Pfalz, Germany D-56068 Position Team Leader / Resident Engineer Russian, Azerbaijan, Armenia and Afghanistan Start/End Date 01-Jan-2006 to 01-Sep-2006 Employer Wiemer & Trachte GmbH Type of Business Construction, Claim Department Country Germany Address Märkische Straße 249 Dortmund, NRW, Germany D- 44141 Position Site Manager Aden Head of Claim Management in Yemen Start/End Date 01-Aug-2002 to 31-Dec-2005 Employer Deutsche Gesellschaft für Technische Zusammenarbeit (gtz) Type of Business Consulting Country Germany Address Dag-Hammarskjöld-Weg 1-5 Eschborn by Frankfurt Germany D-65760 Position Site Supervisor in Afghanistan Start/End Date 01-Jul-1991 to 31-Jul-2002 Employer RRI-Beller Consulting Engineers Type of Business Consulting Engineers Country Germany Address Burgwall 5 Dortmund, NRW, Germany D-44135 Position Assistance Project Manager, Supervisor Abroad, Backstopping Russia, Ghana and Kyrgyz Republic International Assignments: Project Name: The first Railway Line between Hairatan at the Border with Uzbekistan and Mazar-e-Sharif in Afghanistan (3 Terminals, 5 Stations with full Intrastructure) Start Date: 01-Mar-2010 Completion Date: 16-Mar-2011 Person-months of Services: 13 Funding Source: Asian Development Bank Country: Afghanistan Client Name: Asian Development Bank Services Rendered: Project Implementation Consultant, ADB Representative to North Afghanistan • Contract Administration acc. to FIDIC Yellow Book, Plant and Design-Build. • Monitor the Day to Day Progress and major Events and keep ADB HQ informed. • Liaison between the Afghan Government, ISAF and Consulting (SMEC) and the Contractor. • Reporting to ADB HQ. • Assistance to PIU. • Explaining and/or adjusting Ambiguities and/or Discrepancies in the Contract Documents. • Monitor that any upcoming variation orders from the Contractors are properly scrutinized (for justification, cost estimates etc.) by the Consultants before submitting to Project Management Unit(PMU) and ADB HQ. • Determinate the possibility to establish an independent Railway Department. • Coordinate the Operation and Maintenance Contract (O&M) between the Contractor and the Ministry of Public Works (MPW) in Kabul. • Setting up general Clearing Procedures between Uzbekistan and Afghanistan in coordination with the European Commission in Kabul. Advice the relocation of Custom Buildings / Warehouses closer to track. • Monitor the Implementation of the ongoing ADB Road Construction Projects in North Afghanistan. Respective the completion of the Ring Road Projekt. Project Name: Rehabilitation of Airport Mazar-e-Sharif Start Date: 01-Apr-2009 Completion Date: 01-March-2010 Person-months of Services: 11 Funding Source: kfw Entwicklungsbank - ID 342 - 230.00 / 06 AFG Country: Afghanistan Client Name: Ministry of Transport and Civil Aviation (MoTCA) Services Rendered: Team Leader / Resident Engineer • Implementation of Immediate Measures • Supervision of Main Contract, new Terminal Hangar and Infrastructure • Assistance during the Tender Phase with the Head Office and MotCA • Contacting, Supervision • Administration of the Design Build Main Contract • Client Liaison • VO’s Justification and Cost Estimates • Coordination with Local Authorities • Client Liaison • Reporting • Acting RE for NAMSA, NATO Airfield Rehabilitation Project Project Name: Supervision of Roads, Package 1, 270 km Start Date: 01-Mar-2008 Completion Date: 01-Apr-2009 Person-months of Services: 13 Funding Source: Millennium Challenge Corporation (MCC), RRRP CW-SUP-03/2007 Country: Armenia Client Name: Millennium Challenge Account Armenia, S.N.C.O. Services Rendered: Supervision of Roads, Package 1, 270 km, 7 Lots, 7 Contractors, Team Leader • Coordination with MCA, MCC Armenia and Contractors • Monitor Day to Day progress and major Events and keep MCA informed • Liaison between the Associates and Team Members, Client liaison • Design Review and Amendments • Checking of BoQ for Consistency and Accuracy, Supplementations to BoQ • Reporting • Preparation of Technical Specification and Contract Documents • Assistance to PIU • Approving and Monitoring the Contractors Work Program and Source of Materials • Explaining and/or adjusting Ambiguities and/or Discrepancies in the Contract Documents • Inspecting for Approval all working and As-build Drawings prepared by the Contractor • Inspecting and testing Materials and Works to ensure Compliance with Specifications • Controlling and appraising the Work Progress • Issuing Interim Certificates for Payment • Preparation of a Construction Supervision Safety Manual Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: East-West Highway Improvement Project: Final Bidding Documents for Rehabilitation and Reconstruction of Section: Yevlakh-Ganja 01-Mar-2007 01-Apr-2008 13 Islamic Development Bank and Saudi Fund for Development - ICB/MC No.: 3-2007-02 Azerbaijan AzerRoadService OJC, Ministry of Transport Team Leader • Design Review • Client Liaison • Assistance to PIU • Adjustments to Design • Review of Geotechnical Report • Updating of Pavement Design • Cost Estimation • Finalising of Bidding Documents Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: Aden Sewerage Project 20 km sewer network in main roads, 30 pumping stations, 10 km force mains 01-Jan-2006 01-Sep-2006 8 kfw Entwicklungbank - Aden C 3 Yemen Ministry of Water and Environment (LWSCA) Team Leader, Site Manager • Supervision • Reporting • Head of Claim Management in Yemen Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: Infrastructure Construction Activities for the German Army in Afghanistan 01-Aug-2002 01-Dec-2005 40 Bundesministerium für Verteidigung, Berlin Afghanistan Bundesministerium für Verteidigung, Berlin, German Army Project Coordinator Infrastructure • Determination and definitions of interfaces with other ISAF Nations, cost-sharing • Quality management • Supervision • Awarding local planning work to local engineers • Revising execution planning • Revising specifications and price schedules • Variation Orders • Construction management • Handling of claims • Cost control / budgeting • Releasing invoices for payment • Reporting system • Handing over to German Army (Bundeswehr) • Warranty procedure Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: Rehabilitation of the Road Bishkek - Osh Road Maintenance and Safety Assistance Part 1: Equipment Hire Charge System and Accounting Procedures Part 2: Accounting and Rental Agreements 01-Jun-2000 01-Jul-2002 12 ADB - LA Nº 1630 KGZ (SF) Kyrgyz Republic Ministry of Transport and Communication (MoTC) Procurement Specialist • Privatization of a state-owned company • Establishment of an Equipment Pool • Preparation of an EDP Program for Construction Equipment Renting, Depreciation Theories • Implementation of internationally comparable bookkeeping systems in the Kyrgyz Republic • Legalization of the new Regulations by Parliament (by the Ministry of Finance) • Workshops • Road Maintenance Manual Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: Rehabilitation of the Tema - Akosombo Road 88 km Asphalt Road, 56 Culverts, 4 Bridges 01-Feb-1997 01-Jul-1999 28 kfw Entwicklungsbank - GHA / HO / TRC / 12 / 96 Ghana Ghana Highway Authority Supervisor, Acting RE • Supervision of Construction Works • Material Engineer Soil, Concrete, Bitumen • Reporting • Project Performance Management System Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: Military Housing Project (2200 Flats) with Infrastructure Rostov on Don 01-Aug-1995 01-Jun-1996 11 kfw Entwicklungsbank Russian Federation Ministry of Internal Affairs, Moscow Time and Cost Engineer, Acting RE • Claim Management • Time Cost Control • Road Construction Laboratory, Concrete and Bitumen • Railway Network with 1.7 km • Reporting System Project Name: Start Date: Completion Date: Person-months of Services: Funding Source: Country: Client Name: Services Rendered: Military Housing Project with Infrastructure Morosowsk 01-Apr-1993 01-Nov-1994 20 kfw Entwicklungsbank Russian Federation Ministry of Internal Affairs, Moscow Time and Cost Engineer, Supervision • Time Cost Control. • Establishing Reporting System • Introducing of MS - Project as a reporting Tool • Standardization of Reporting Procedures to the Client • Supervision of Infrastructure Works |
|||
Verwendete Technologie |
|||
Administration
Bauingenieurwesen (allg.)
Bridges
C
Change Management
Controlling
Qualitätsmanagement (allg.)
Reporting
Technische Beratung
Technisches Projektmanagement
Sprache Deutsch |
Einstufung Muttersprache |
Sprache Englisch |
Einstufung Verhandlungssicher |
Sprache Russisch |
Einstufung Grundkenntnisse |
Sprache Arabisch |
Einstufung Grundkenntnisse |
Abschlussjahr 1991 |
Studiengang Bauingenieurwesen |
Ort Hagen |
Studienabschluss Dipl. Ingenieur |
Zertifikat/Weiterbildung siehe CV. |
Ausstellungsdatum Januar 2013 |