IT principal consultant, infrastructure architect, project manager
Profil-ID 46643773
Köln |
asap |
- |
Freiberuflich |
03/2010 - 05/2010 Dauer 3 Monate |
Rolle Senior Consultant IT, Project Manager |
||
Branche |
Einsatzort |
||
Aufgaben Project Manager / Senior Consultant / Service & Process Design; acting in the project "MWE3 - Managed Workplace Environment" / for REUTAX AG / Zürich / CH; SIEMENS Schweiz AG, SIEMENS IT Solutions and Services, SIS GO SD S / CH- 8047 Zürich |
|||
Verwendete Technologie |
|||
02/2010 - 05/2010 Dauer 4 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben IT Service Provider acting in a project as Project manager and Infrastructure Solution Design Consultant / PM SIS SD S - Managed Workplace Design Project Management and strategy lead for the development |
|||
Verwendete Technologie Windows 7 |
|||
12/2009 - 01/2010 Dauer 2 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Insurance OSD engineering and design Windows Server 2008 R2 security strategy and BI requirements for deployment Windows 7 |
|||
Verwendete Technologie Windows Server 2003 Windows 7 SCCM (System Center Configuration Manager) |
|||
08/2009 - 11/2009 Dauer 4 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Zürich(Schweiz), London(Vereinigtes Köni |
||
Aufgaben Bank Client Build and Desktop Engineering & Testing Project Management Consultant for Client / Desktop BUILD Windows 7 ( SCCM 2007, Windows Server System 2008 ) in the global project "iDesktop - ONE BANK PLATFORM" Consultant for SCCM 2007 / SCOM 2007 concept / documentation / planning / implementation / infrastructure design / process design / BCP and DR / Rollout- and Release management Set-up of an overall project documentation (PID, Issue and Risk Log, Communication Plan, Roles & Responsibility diagram etc.) based on a standardized Program Management Methodology Review and changes of Technical Service Level Agreements Detailed planning of all infrastructure related Change of Control activities in an overall project plan based on business requirements and existing policy procedures Provisioning of cost estimates for infrastructure divestiture activities Coordination of workshops Making of an overall project plan for all activities within the scope of the project, as well as implementing of a weekly management reporting ( Zürich / London / New York ) Restructuring of existing project plans and definition of areas of responsibilities technical lead of development teams in Zürich and London |
|||
Verwendete Technologie Windows Server 2003 Windows 7 SCCM (System Center Configuration Manager) |
|||
03/2009 - 07/2009 Dauer 5 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Bank Data Center Design & Process Development acting in a project as Senior Infrastructure Consultant / PM responsible technical project lead, IT Virtualization / NASPA by A&O Group / Virtualization Project IT- Service Architecture / Infrastructure / IT project lead / documentation Consultant for SCCM 2007 / SCOM 2007 concept / documentation / planning / implementation / infrastructure redesign / process design / BCP and DR / Rollout Review and changes of Technical Service Level Agreements Coordination of workshops Review of existing project plan draft. Re-structuring and updating the project plan comprehensively |
|||
Verwendete Technologie Microsoft Windows (allg.) SCCM (System Center Configuration Manager) |
|||
10/2008 - 12/2008 Dauer 3 Monate |
Rolle Senior System Consultant / TPM |
||
Branche |
Einsatzort |
||
Aufgaben TOP-IT services GmbH | INFORSA.COM acting in a project for INFORSA.COM as Senior System Consultant / TPM responsible technical project lead, IT datacenter move BAYERN LB / Muenchen by IZB Muenchen / Migration Project |
|||
Verwendete Technologie |
|||
08/2008 - 09/2008 Dauer 2 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Telecommunication Position Project Manager / Wintel Infrastructure Specialist / Data Center Design & Process Development Project management / technical Team Lead Gigaset Communications Infrastructure Design & Carve Out Management Project Manager: Planning, proposals and RFP local & global support during the carve out planning phase Infrastructure analysis and design Descrition of RFP and bidding details License Management / Compliance Documentation / Infrastructure planning Specify architectural & technical guidelines task tracking and workload coordination Firewall and DMZ change request management |
|||
Verwendete Technologie Firewalls (allg.) Telekommunikation / Netzwerke (allg.) |
|||
08/2007 - 07/2008 Dauer 12 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Zürich(Schweiz) |
||
Aufgaben Bank Project Manager Wintel Infrastructure / Senior System Consultant / Datacenter Design & Process Development, Senior Enterprise Information Service Wintel EMEA DATACENTER Design & Management Project Manager: Planning, development and deployment of Project sheets WINTEL Support Zürich; ITSM Infrastructure Analysis and design Change Management / technical meetings standardization and consolidation Migration of Windows Services UAT = technical & user acceptance tests License Management / Compliance Documentation / Infrastructure planning task tracking and workload coordination budget and resource responsibility |
|||
Verwendete Technologie ITIL Microsoft Windows (allg.) |
|||
05/2006 - 07/2007 Dauer 15 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Bank Position Senior Consultant Audit, Control and compliance, Senior System Engineer / ITIL Service manager, Project management / Lead Revision of Process DATACENTER Management Team / Middleware Project manager and responsible for Audit, Control and compliance EMEA - Team, there practical relief at: Planning, development and deployment of Project sheets Workload- and Risk management; ITSM Incident management, Change management standardization of process workflow optimize Distributed Systems Windows Services License Management eSystems management / Hardware monitoring Documentation DMS / ITIL / Infrastructure planning |
|||
Verwendete Technologie Incident Management ITIL Microsoft Windows (allg.) Risikomanagement Prozess- / Workflow |
|||
10/2005 - 04/2006 Dauer 7 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Bank Senior Consultant and Team leader CommWIN-Project, Senior System Engineer / Network Engineer IT, Project management / Leading Migration process AMD |
|||
Verwendete Technologie Incident Management Telekommunikation / Netzwerke (allg.) Risikomanagement |
|||
01/2005 - 01/2007 Dauer 25 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Cologne(Deutschland) |
||
Aufgaben TUEV Rhineland / Cologne ITIL® / EXIN ITIL foundation certificate in IT Service Management 2007 ITIL® / EXIN ITIL manager's certificate in IT Service Management |
|||
Verwendete Technologie ITIL |
|||
01/2005 - 09/2005 Dauer 9 Monate |
Rolle Senior System Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
10/2004 - 09/2005 Dauer 12 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Telecommunication Project manager and responsible Team leader for the migration of several countries to the Alcatel Datacenter standard, there practical relief at: SLA 3 rd - level support for Wintel Northern Europe |
|||
Verwendete Technologie ITIL Telekommunikation / Netzwerke (allg.) Wirtschaftsinformatik |
|||
07/2004 - 09/2004 Dauer 3 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben IT Project management, Consultant and Team leader there practical relief at: Installations and configurations of Citrix-Servers Optimization of rollout planning for the migration to Win2K Evaluating and Documentation Troubleshooting and Problem management rollout and migrate Laptops, Desktops and Servers at 90 locations / 1400 Users Hardware- and Software-Troubleshooting 3.rd level |
|||
Verwendete Technologie Telekommunikation / Netzwerke (allg.) Citrix (allg.) |
|||
03/2004 - 06/2004 Dauer 4 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Steel administrative System engineer, MCSE 2K3, there practical relief at: Hardware installations and configuration of MS-Server Implementation Network securities / Firewall standards Installing Exchange Mail filtering / Content scanning Analyzing Network infrastructure and Documentation server optimization / driver support / updates |
|||
Verwendete Technologie Firewalls (allg.) Telekommunikation / Netzwerke (allg.) IT-Support (allg.) |
|||
01/2004 - 03/2004 Dauer 3 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Frankreich |
||
Aufgaben Automobile network specialist, CNE 3+4+5 / MCSE+I / MCSE 2K, there practical relief at: Hardware migration, installation and configuration of new components / LAN / WAN / Server rollout and migration to Win2K / ADS Documentation / analyzing Fulfilling the rollout standards / hardware standards given by the Citroën Ltd. Company / France rollout and migrate Laptops, Desktops and Servers Hardware- and Software-Troubleshooting server optimization / driver support / updates / 3.rd level |
|||
Verwendete Technologie WAN Telekommunikation / Netzwerke (allg.) |
|||
/2004 - bis jetzt |
Rolle IT Senior Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
/2004 - bis jetzt |
Rolle System Engineer / Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
01/2003 - 04/2003 Dauer 4 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Telecommunication Project manager, subject field IT-Organization, there MS- Windows Project, Migration to .NET / ADS Documentation and inventory of the IT-Environment, Network- and Hardware analyses Design of migration strategies of NOVELL and NT4 to Windows 2000 / Microsoft ADS Co-ordination of the external support facility Implementation of Compaq / HP servers Implementation Network management / Database Implementation of MS-Project-Central as central project management tool Optimization of the support facility Construction, installation and initiation remote installation mechanism / Remote Installation Service implementing automatic server support facilities Documentation and recommendations for the optimization of the workflows in the system administration Project engineering and Project planning |
|||
Verwendete Technologie Novell Netware Microsoft Windows (allg.) .Net Telekommunikation / Netzwerke (allg.) Microsoft Office (allg.) |
|||
01/2003 - 01/2005 Dauer 25 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben 2005 Microsoft certified partner/business solutions |
|||
Verwendete Technologie |
|||
07/2001 - 03/2002 Dauer 9 Monate |
Rolle Projektleiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Energy ( manufacture of Electronic parts ) Responsible Consultant for the Project Windows 2000, ADS design and Implementation Team leader and responsible in the project: Documentation and inventory of the IT-environment Design of migration strategies of NOVELL and NT4 to Windows 2000 / Microsoft ADS Co-ordination of the external support facility Implementation of Compaq Insight Manager XE Compiling and evaluation of the SNMP-announcements and definition of the alarm parameters Implementation of MS-Project-Central as central project management tool on MS-SQL Database Server Optimization of the central HELPDESK-Management Construction, installation and initiation of Remote sites Construction and implementing of a Download archive to the server support facility relief (Drivers and software updates) Design of recommendations for the optimization to the workflow of the Network administration and the System management Optimization of the Teleservicing / Remote control |
|||
Verwendete Technologie Novell Netware Microsoft Windows (allg.) SNMP Telekommunikation / Netzwerke (allg.) Microsoft Office (allg.) Elektronik Microsoft SQL Server Prozess- / Workflow |
|||
/2001 - bis jetzt |
Rolle System Engineer / Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
/2001 - bis jetzt |
Rolle IT Senior System Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
/2001 - bis jetzt |
Rolle System Engineer / IT Senior Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
05/2000 - 07/2001 Dauer 15 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Cologne(Deutschland) |
||
Aufgaben Printing Presses Conception and construction of an education Network on the FAIR DRUPA in Duesseldorf SONY Europe Central IT, Cologne Interface programming and adaptation to SAP R3 for MS Office |
|||
Verwendete Technologie ODBC (Open Database Connectivity) Telekommunikation / Netzwerke (allg.) Microsoft Office (allg.) IT-Support (allg.) |
|||
05/2000 - 07/2001 Dauer 15 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Cologne(Deutschland), Bonn(Deutschland) |
||
Aufgaben Automobile Network specialist, CNE 3+4 / MCSE+I, there practical relief at: Hardware installations of physical Network component/ LAN / WAN Initiation of CISCO components / Router configuration / Security / Firewall Optimization of software-installations for Network-PC´s and Laptops Optimization of the protection resources and Backuproutines ( CA ARC Serve ) Construction, installation and initiation of one Intranet server for the preparation of a technical Documentation archive Building a technical Documentation database and Archive with index search on basis of the implemented Intranet |
|||
Verwendete Technologie Firewalls (allg.) Novell Netware Microsoft Windows (allg.) WAN Telekommunikation / Netzwerke (allg.) Cisco Switch (allg.) IT-Support (allg.) Microsoft SQL Server Prozess- / Workflow |
|||
04/2000 - 07/2001 Dauer 16 Monate |
Rolle System Engineer / Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
01/2000 - 01/2001 Dauer 13 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben |
|||
Verwendete Technologie |
|||
/2000 - bis jetzt |
Rolle System Engineer / Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
01/1999 - 01/2002 Dauer 37 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben 2002 CNE/Certified Novell Engineer |
|||
Verwendete Technologie Novell Netware |
|||
01/1999 - 01/2000 Dauer 13 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben COMPAQ / Accredited system engineer 2000 CACP Unicenter / COMPUTER ASSOCIATES certified professional |
|||
Verwendete Technologie |
|||
01/1994 - 01/1998 Dauer 49 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben 1998 CNE/Certified Novell Engineer |
|||
Verwendete Technologie Novell Netware |
|||
09/1988 - 03/2000 Dauer 139 Monate |
Rolle System Engineer / Consultant |
||
Branche |
Einsatzort |
||
Aufgaben |
|||
Verwendete Technologie |
|||
08/1987 - bis jetzt Dauer 458 Monate |
Rolle IT Senior Consultant, IT Infrastructure Architect, Project Manager / Freelancer |
||
Branche |
Einsatzort |
||
Aufgaben FREELANCER |
|||
Verwendete Technologie |
|||
03/1987 - bis jetzt Dauer 463 Monate |
Rolle IT principal consultant, infrastructure architect, project manager / freelancer |
||
Branche |
Einsatzort |
||
Aufgaben CIO / CKO / CEO / CFO |
|||
Verwendete Technologie |
|||
01/1980 - 10/2015 Dauer 430 Monate |
Rolle Mitarbeiter |
||
Branche |
Einsatzort Deutschland |
||
Aufgaben Experience Languages German: Fluent Spanish: Fluent English: Fluent |
|||
Verwendete Technologie |
|||
.Net
Active Directory
Administration
ASP.NET
Assembler
Asset management
C
C#
C++
Change Management
Cisco
Cisco Switch (allg.)
CMMI
COBIT Framework
Cobol
COM/OLE/ActiveX
Compliance management
Content Management
Controlling
CSS
Data Mining
Desktop
DNS
Dreamweaver
Einzelhandel
Excel
Fahrzeugdesign / Automobildesign
FDDI (Fiber Distributed Data Interface)
Fortran
HP
HP OpenView
HTML
IBM Tivoli Software
IIS
Incident Management
Informatik
Ingress
iOS
ITIL
Java
Java (allg.)
JavaScript
LAN
Linux (allg.)
Mac OS
Microsoft SharePoint Server
Microsoft SQL Server
Microsoft Windows (allg.)
Migration
MindManager
MS Dynamics CRM
MS Visio
Netzwerkmanagement
Novell Netware
Oracle (allg.)
OS/400
Outsourcing
Pascal
PDA
Perl
PMO
PRINCE2
Projektmanagement
Prozess- / Workflow
Prozessberatung
Release Management
Remedy
Reporting
Rollout
Router
SAN / NAS
SCCM (System Center Configuration Manager)
SCRUM
Server
Service Management
Sharepoint 2007
Sharepoint 2010
Siemens
SLA
SMTP
SNA (Systems Network Architecture)
SNMP
SONY
SQL
Switches
Sybase
System Design
TCP/IP
Telekommunikation / Netzwerke (allg.)
UNIX (allg.)
Virtual Memory System (VMS)
Visual Basic
VPN (Virtual Private Network)
WAN
Webdesign
Windows
Windows 10
Windows 7
Windows Server 2008 R2
Windows Vista
Windows XP
XHTML (Extensible HyperText Markup Language)
XML
Sprache Deutsch |
Einstufung Muttersprache |
Sprache Spanisch |
Einstufung Verhandlungssicher |
Sprache Englisch |
Einstufung Verhandlungssicher |
Sprache Französisch |
Einstufung Grundkenntnisse |